Free tool for businesses, inspectors and permit clerks

Does it need a hazardous materials permit?

Pick the hazard category, its physical state and the amount. The answer is whether the 2021 International Fire Code requires an operational permit under Section 105.5, with the table row and its citation, what the code excepts, the notes whose published copies disagree, and whether NFPA 704 signs follow. What decides the answer and was not given is asked for, never guessed. Free from FireInspection360, the fire prevention platform built by fire inspectors.

No registration needed for the demo site.
A fire officer and a business owner shaking hands in a fire station

Is an operational permit required?

2021 IFC Tables 105.5.9, 105.5.11 and 105.5.22 and Sections 105.5.16, 105.5.18 and 105.5.29. A permit is required only in excess of the amount the code names.

IFC Section 202

Not sure which? Find it from the safety data sheet.

Physical stateEach has its own amount
The amountNever converted

The code states each amount in one unit: an amount in another is not compared, and the answer says which unit to use.

Where it is keptSome amounts differ
What some rows nameOptional
LP-gas, carbon dioxide systems and fueling tanks

A few rows apply only to one kind of use. Left unanswered, the answer is tried both ways and stands only when both agree.

Pick the hazard category, its physical state and the amount. Whether a permit is required appears here with the row of the code behind it, what it excepts, and whether NFPA 704 signs follow.
This is a calculation aid, not a determination. Verify it against the code your jurisdiction has adopted, including any local amendments, before it is relied on. A permit is the fire code official's to require, under the code your jurisdiction adopted and its amendments.
How it works

An operational permit starts above an amount, and the amount depends on the category, the state and sometimes the place.

Section 105.5 of the International Fire Code lists the activities that need an operational permit from the fire code official. For hazardous materials the permit turns on an amount: Table 105.5.22 names one per hazard category and physical state, and sends some categories to their own rules, compressed gases to Table 105.5.9, cryogenic fluids to Table 105.5.11, flammable and combustible liquids to Section 105.5.18, explosives to Section 105.5.16 and LP-gas to Section 105.5.29. A permit is required in excess of the amount, so the amount itself needs none, and some rows require one for any amount at all.

Some answers turn on facts beyond the category. Class I, II and IIIA liquids and cryogenic fluids have one amount inside a building and another outside; carbon dioxide in an enrichment system or a beverage dispenser has its own row; LP-gas is its own section. Where one of these decides the answer and was not given, the check tries both ways and says which question to ask. Two notes of Table 105.5.22 raise the amount for a Class 3 oxidizer kept for maintenance, and their published copies disagree on a quantity in them, so the answer points to the adopted code instead of quoting either.

The permit also decides the signs. Section 5003.5 requires NFPA 704 hazard identification signs at the entrances to where hazardous materials are stored, dispensed, used or handled in quantities requiring a permit, so the answer says whether the signs follow.

Permits in FireInspection360

FireInspection360 issues and tracks operational permits: the application, the fee, the inspection it needs and the permit itself, with the business able to apply and pay online.

See permits in FireInspection360

See the whole platform with your own records.

A one-hour walkthrough with a fire prevention expert, or the demo site right now.